Energy Sector Structures (Power lines, Substations, Cooling towers, Chimneys, Thermo electrical station etc)
Assignment description: |
Laboratory and in - situ testing of the quality and curent condition of building materials used, using methods with and without destruction, Cooling tower of thermo -electric power plant, Pljevlja |
Position in the project: |
Chief Materials Examiner |
Beneficary: |
Electricity board of Montenegro |
Date: |
May 2002 – Jan 2003 |
Assignment description: |
Laboratory and in - situ testing of the quality and curent condition of building materials used, methods with and without destruction, Chimney of thermo-electric power plant, “height aprox. 120 m), Pljevlja |
Position in the project: |
Chief Materials Examiner |
Beneficary: |
Electricity board of Montenegro |
Date: |
May 2002 – Jan 2003 |
Assignment description: |
Concrete mix design, building supervision and laboratory proof load testing of RC electric cable post for voltages of 0.4 kV to 35 kV, three different types, Podgorica |
Position in the project: |
Chief structural designer i ispitivanja |
Beneficary: |
VMS Company doo, Podgorica |
Date: |
Jul 2002 – Oct 2003 |
Assignment description: |
Technical assessment/revision of the Final design of Hydrotechnical structures for reconstruction and increase in size of ash stockpile, Maljevac, Pljevlja |
Position in the project: |
Member of official body - reporting on structural design |
Beneficary: |
Electricity board of Montenegro |
Date: |
Sep 2003 – Nov 2003 |
Assignment description: |
Technical assessment/revision of the Final design and workmanship drawings for Construction of Power transmission lines of DV 400 kV Podgorica – Albania, approx. 23 km, 79 posts, Podgorica/Albania border |
Position in the project: |
Member of official body - reporting on structural design |
Beneficary: |
Electricity board of Montenegro |
Date: |
Nov 2008 - Jul 2009 |
Assignment description: |
Construction of Power transmission lines of DV 400 kV Podgorica – Albania, approx. 23 km, 79 posts, aprox. 7 mil E, Podgorica/Albania border, financed by German KFW bank, Croatian contractor |
Position in the project: |
Structural works supervisor |
Beneficary: |
Electricity board of Montenegro |
Date: |
Jan 2009 - Oct 2010 |
Assignment description: |
Technical assessment/revision of the Final design and workmanship drawings for Power transmission lines DV 110 kV TS Podgorica 5 – KAP, length of approx. 11 km, Podgorica |
Position in the project: |
Team leader of the official body i Odgovorni revident za konstrukciju |
Beneficary: |
Electricity board of Montenegro |
Date: |
Sep 2009 - Nov 2009 |
Assignment description: |
Technical assessment/revision of the Final design and workmanship drawings of Reconstruction of Trafo substation TS 110/10 kV Podgorica 5, Podgorica |
Position in the project: |
Team leader of the official body i Odgovorni revident za konstrukciju |
Beneficary: |
Electricity board of Montenegro |
Date: |
Oct 2009 - Nov 2009 |
Assignment description: |
Reconstruction and increasing of capacity of Trafo substation TS 400kV Podgorica 2 - Tolosi, “new 400 kV DV field for Tirana power transmission line, and replacing the equipment for 400 kV DV field for Ribarevine), Podgorica , financed by German KFW bank, Croatian contractor |
Position in the project: |
Structural works supervisor |
Beneficary: |
Electricity board of Montenegro |
Date: |
May 2010 – Oct 2010 |
Assignment description: |
Production of the Design brief - civil engineering works, for Preliminary design, for the TS 400/110/35 kV, Lastva, Kotor |
Position in the project: |
Team Leader |
Beneficary: |
CGES, Podgorica |
Date: |
Aug 2011 - Dec 2011 |