- Home
- About Us
- Services
- Portfolio
- Registration
- Contact
2002.
Assignment description: |
Final design and workmanship drawings of Apartment/Office building - Stara vatrogasna, approx. 8.700 m2, including a sub phase Final design of Apartment/Office building, approx. 4.900 m2, Podgorica |
Position in the project: |
Chief structural designer |
Beneficary: |
Ave Marija Koljcevic doo, Podgorica |
Date: |
Oct 2001 – Jun 2002 |
Assignment description: |
Technical assessment/revision of the Final design and workmanship drawings for the Reconstruction and renovation of Hotel Maestral, approx. 14.500 m2, phase I, Budva |
Position in the project: |
Member of official body - reporting on structural design |
Beneficary: |
HIT Montenegro |
Date: |
Feb 2002 – Mar 2002 |
Assignment description: |
Expertise on the Final design of reconstruction of Building of a Swimming pool complex Skver, including visuel assessment, surveying, in-situ and laboratoriy testing of materials used, structural analysis, and design, aprox. 1,100m2, Herceg Novi |
Position in the project: |
Rukovodilac projekta |
Beneficary: |
Herceg Novi Swimming Club |
Date: |
Apr 2002 – Jul 2002 |
Assignment description: |
Laboratory and in - situ testing of the quality and curent condition of building materials used, using methods with and without destruction, Cooling tower of thermo -electric power plant, Pljevlja |
Position in the project: |
Chief Structural Examiner |
Beneficary: |
Electricity board of Montenegro |
Date: |
May 2002 – Jan 2003 |
Assignment description: |
Laboratory and in - situ testing of the quality and curent condition of building materials used, methods with and without destruction, Chimney of thermo-electric power plant, “height aprox. 120 m), Pljevlja |
Position in the project: |
Chief Structural Examiner |
Beneficary: |
Electricity board of Montenegro |
Date: |
May 2002 – Jan 2003 |
Assignment description: |
Expertise on used materials and structure of an Office building – Centralna post of Montenegro, Bulevar Lenjina, in order to examine posibilities of expanding the building, Podgorica |
Position in the project: |
Chief Structural Examiner |
Beneficary: |
Monet doo, Podgorica |
Date: |
Jun 2002 – Jul 2002 |
Assignment description: |
Concrete mix design, building supervision and laboratory proof load testing of RC electric cable post for voltages of 0.4 kV to 35 kV, three different types, Podgorica |
Position in the project: |
Chief structural designer i ispitivanja |
Beneficary: |
VMS Company doo, Podgorica |
Date: |
Jul 2002 – Oct 2003 |
Assignment description: |
Construction of the Fire Brigade Building Complex, in total 6 buildings/towers and training grounds, aprox. 14,000 m2, for European Agency for Reconstruction contract, Podgorica |
Position in the project: |
Chief site supervisor EAR |
Beneficary: |
IC Consulenten, Austria |
Date: |
Jul 2002 - Dec 2003 |
Assignment description: |
Technical assessment/revision of the Final design and workmanship drawings for the Reconstruction and renovation of Hotel Maestral, approx. 14.500 m2, phase II, Budva, Montenegro |
Position in the project: |
Member of official body - reporting on structural design |
Beneficary: |
HIT Montenegro |
Date: |
Sep 2002 – Oct 2002 |
Assignment description: |
Technical assessment/revision of the Final design of an Apartment building - Radanovic, Brezine, urban plot 960/1 KO Petrovac, approx. 1,300 m2, Petrovac |
Position in the project: |
Member of official body - reporting on structural design |
Beneficary: |
Private investor |
Date: |
Nov 2002 – Dec 2002 |