- Home
- About Us
- Services
- Portfolio
- Registration
- Contact
Until 1999
Assignment description: |
Structural analysis, design and testing of structures under impact load conditions |
Position in the project: |
Structural designer |
Beneficary: |
Case doo, Doncaster, Engleska |
Date: |
May 1994 - Jul 1994 |
Assignment description: |
Structural analysis and design of metal frames for impact and explosion resistant windows |
Position in the project: |
Structural designer |
Beneficary: |
Impactex glass product, Pilkington, UK |
Date: |
Jun 1995 - Oct 1995 |
Assignment description: |
Preparation of Tender dossier “FIDIC based), Technical conditions, Design briefs and other necessary technical documentation for the Preliminary design of Motorways through Montenegro, sections: Bar – Tanki rt, Tanki rt - road Cetinje/Podgorica, Smokovac – road Cetinje/Podgorica, Smokovac – Matesevo, Podgorica bypass, Andrijevica – Berane – Boljare |
Position in the project: |
Project management team member |
Beneficary: |
Directorate of Public works |
Date: |
May 1997 – Aug 1999 |
Assignment description: |
Management of the preparatory technical activities “Design briefs, Tender documentation, revision of Preliminary design etc) for the design and building of Motorways through Montenegro |
Position in the project: |
Project management team member |
Beneficary: |
Directorate of Public works |
Date: |
Jan 1998 – Sep 2000 |
Assignment description: |
Design brief for building a Datebase necessary for the project management of the Design of Motorways through Montenegro, Podgorica |
Position in the project: |
Project management team member |
Beneficary: |
Directorate of Public works |
Date: |
Jul 1998 - Sep 1998 |
Assignment description: |
Cost Benefit Analysis for the Preliminary design, Motorway through Montenegro, sections Andrijevica – Berane – Boljare and Bar – Tanki rt |
Position in the project: |
Project management team member |
Beneficary: |
Directorate of Public works |
Date: |
Sep 1998 – Nov 1998 |
Assignment description: |
Preparation of Tender dossier “FIDIC based), Technical conditions, Design briefs and other necessary technical documentation for the International competition for the Preliminary design solution of a Bridge over Bokokotorian bay |
Position in the project: |
Project management team member |
Beneficary: |
Government of Montenegro |
Date: |
Oct 1998 – Feb 1999 |
Assignment description: |
Preparation of Tender dossiers “FIDIC based), Technical conditions, Design briefs and other necessary technical documentation for: Selection of Designer “Preliminary and Main Design); Contractor for Building; and Provider for Equipment supply for the Fruit and vegetable Distribution centre in Podgorica |
Position in the project: |
Project management team member |
Beneficary: |
Directorate of Public works |
Date: |
Oct 1998 – Aug 1999 |
Assignment description: |
Preparation of Technical conditions, Design briefs and other necessary technical documentation for the Conceptual and Preliminary design of structures “bridges, viaducts, tunnels etc) on primary roads Djurmani - Tanki rt and Smokovac – road Cetinje/Podgorica, in total more than 20 structures |
Position in the project: |
Project management team member |
Beneficary: |
Government of Montenegro |
Date: |
Apr 1999 – Aug 1999 |
Assignment description: |
Proof load testing of bridge Ribnica, Podgorica |
Position in the project: |
Team member |
Beneficary: |
Podgorica Municipality |
Date: |
May 1999 – Sep 1999 |
Assignment description: |
Preparation of Tender dossier “FIDIC based) for the International competition for selection of the Designer for the Bridge over Bokokotorian bay, Podogirca |
Position in the project: |
Project management team member |
Beneficary: |
Government of Montenegro |
Date: |
Jul 1999 – Aug 1999 |
Assignment description: |
Tender dossier for the selection of the contractor for the Reconstruction of the Primary school "Srbija", hosting large number of refugees, displaced persons and members of RAE population, approx. value 1.2mil. DM, Bar |
Position in the project: |
Project Manager |
Beneficary: |
NGO COOPI, Italy |
Date: |
Aug 1999 |
Assignment description: |
Design and construction of a range of engineering projects, including reconstructions of a number of primary schools in Podgorica and Bar, and building of refugee settlements and infrastructure in Bar and Niksic, all related to help to refugees, displaced persons and members of RAE population |
Position in the project: |
Project Manager Consultant |
Beneficary: |
NGO COOPI, Italy |
Date: |
Aug 1999 - Jul 2000 |
Assignment description: |
Preparation of Tender dossier “FIDIC based) for International competition for selection of Contractor for the Reconstruction of the Main jetty of Port of Bar |
Position in the project: |
Project management team member |
Beneficary: |
Government of Montenegro |
Date: |
Oct 1999 – Feb 2000 |