2003.
Assignment description: |
Laboratory and in - situ testing of the quality and curent condition of building materials used, using methods with and without destruction, Cooling tower of thermo -electric power plant, Pljevlja |
Position in the project: |
Chief Structural Examiner |
Beneficary: |
Electricity board of Montenegro |
Date: |
May 2002 – Jan 2003 |
Assignment description: |
Laboratory and in - situ testing of the quality and curent condition of building materials used, methods with and without destruction, Chimney of thermo-electric power plant, “height aprox. 120 m), Pljevlja |
Position in the project: |
Chief Structural Examiner |
Beneficary: |
Electricity board of Montenegro |
Date: |
May 2002 – Jan 2003 |
Assignment description: |
Concrete mix design, building supervision and laboratory proof load testing of RC electric cable post for voltages of 0.4 kV to 35 kV, three different types, Podgorica |
Position in the project: |
Chief structural designer i ispitivanja |
Beneficary: |
VMS Company doo, Podgorica |
Date: |
Jul 2002 – Oct 2003 |
Assignment description: |
Construction of the Fire Brigade Building Complex, in total 6 buildings/towers and training grounds, aprox. 14,000 m2, for European Agency for Reconstruction contract, Podgorica |
Position in the project: |
Chief site supervisor EAR |
Beneficary: |
IC Consulenten, Austria |
Date: |
Jul 2002 - Dec 2003 |
Assignment description: |
Technical assessment/revision of the Final design of Pavement structure on the road Duklo – Mokra njiva, aprox. 1,500m, Niksic, financed by USAID |
Position in the project: |
Internal revision body – Team leader |
Beneficary: |
CHF Montenegro |
Date: |
Aug 2003 – Sep 2003 |
Assignment description: |
Technical assessment/revision of the Final design of Hydrotechnical structures for reconstruction and increase in size of ash stockpile, Maljevac, Pljevlja |
Position in the project: |
Member of official body - reporting on structural design |
Beneficary: |
Electricity board of Montenegro |
Date: |
Sep 2003 – Nov 2003 |
Assignment description: |
Technical assessment/revision of the Final design and workmanship drawings, and Programme of monitoring of ground and structures, for the Reconstruction and renovation of Hotel Maestral, currently approx. 10.500 m2, to be increased to approx. 14.500 m2, phase III, Budva, Montenegro |
Position in the project: |
Member of official body - reporting on structural design |
Beneficary: |
HIT Montenegro |
Date: |
Dec 2003 – Feb 2004 |