- Home
- About Us
- Services
- Portfolio
- Registration
- Contact
Reconstruction/Refurbishment projects
Assignment description: |
Design and construction of a range of engineering projects, including reconstructions of a number of primary schools in Podgorica and Bar, and building of refugee settlements and infrastructure in Bar and Niksic, all related to help to refugees, displaced persons and members of RAE population |
Position in the project: |
Project Manager Consultant |
Beneficary: |
NGO COOPI, Italy |
Date: |
Aug 1999 - Jul 2000 |
Assignment description: |
Reconstruction of a primary school Vuko Jovovic,Ljututuk, Danilovgrad |
Position in the project: |
Designer |
Beneficary: |
NGO Cooperazione Italiana, Italy |
Date: |
April 2000 |
Assignment description: |
Reconstruction of the primary road from Podgorica to airport Golubovci, EU/OBNOVA contract |
Position in the project: |
Resident Engineer Assistant EU |
Beneficary: |
Technital, Italy |
Date: |
Jun 2000 - Dec 2000 |
Assignment description: |
Tender dossier “FIDIC based) for the selection of the Designer and Contractor “TURN KEY contract) for the Reconstruction of the Main waste water treatment plant, Niksic |
Position in the project: |
Project Manager |
Beneficary: |
NGO COOPI, Italy |
Date: |
Dec 2000 |
Assignment description: |
Final design and workmanship drawings for Reconstruction of the Central bank of Montenegro - phase I and II, Podgorica |
Position in the project: |
Chief structural designer |
Beneficary: |
Central bank of Montenegro |
Date: |
Jun 2001 – Oct 2001 |
Assignment description: |
Reconstruction and strengthening of the roof structure with the implementation of roof solar collectors, Podgorica |
Position in the project: |
Chief structural designer |
Beneficary: |
Clinical centre of Montenegro |
Date: |
Jul 2006 – Sep 2006 |
Assignment description: |
Reconstruction of Biotechnical Institute, European Agency for Reconstruction contract |
Position in the project: |
Resident Expert EAR |
Beneficary: |
Safege/ Tebodin |
Date: |
Dec 2006 - Aug 2007 |
Assignment description: |
As-build design and drawings, and Programme of monitoring of ground and structures, for the Fire brigade complex, approx. 14,000m2, Stari Aerodrom, Podgorica |
Position in the project: |
Lead Designer and Chief structural designer |
Beneficary: |
Podgorica Municipality |
Date: |
Jun 2008 – Dec 2008 |
Assignment description: |
Final design and workmanship drawings for reconstruction of Hotel Palma, Tivat, approx. 6,000 m2 |
Position in the project: |
Chief structural designer |
Beneficary: |
HTP Primorje, Tivat |
Date: |
Jun 2011 - to date |
Assignment description: |
Final design and workmanship drawings for reconstruction of Hotel Planinka, Zabljak, approx. 7,000 m2 |
Position in the project: |
Chief structural designer |
Beneficary: |
HTP Primorje, Tivat |
Date: |
Dec 2011 - to date |